In more detail
Levelling runs start and finish on benchmarks. Before using one, check that it has not been disturbed and that its height refers to the datum required by the project.
A stable, permanently marked point whose height above a vertical datum is precisely known.
Levelling runs start and finish on benchmarks. Before using one, check that it has not been disturbed and that its height refers to the datum required by the project.
Determining height differences by reading a vertical staff through a level set horizontal.
The reference surface from which heights are measured, usually based on mean sea level.
A framework of accurately coordinated, marked points used as the reference for all other survey work on a project.