5D BIM

Linking model elements to cost data for estimating and cost control.

In more detail

Quantities extracted from the model are combined with rates to produce estimates that update as the design changes. The model must be structured and classified consistently for reliable results.

RELATED TERMS
  • 4D BIM

    Linking model elements to the construction schedule to simulate the build sequence over time.

  • Quantity take-off (QTO)

    Extracting measured quantities such as areas, volumes and counts from a model.

  • Building Information Modelling (BIM)

    A collaborative process for creating and managing structured digital information about a built asset throughout its life.