In more detail
Quantities extracted from the model are combined with rates to produce estimates that update as the design changes. The model must be structured and classified consistently for reliable results.
Linking model elements to cost data for estimating and cost control.
Quantities extracted from the model are combined with rates to produce estimates that update as the design changes. The model must be structured and classified consistently for reliable results.
Linking model elements to the construction schedule to simulate the build sequence over time.
Extracting measured quantities such as areas, volumes and counts from a model.
A collaborative process for creating and managing structured digital information about a built asset throughout its life.